Workplace Moving Timeline Guide for London Offices

Workplace Moving Timeline Guide for London Offices

Writer: Oliver Naimsith
Oliver Naimsith
Oct 13
6 min read

A workplace move can look straightforward on a floor plan, then become complicated the moment IT cables, access passes, leased furniture, confidential files and staff routines enter the picture. This workplace moving timeline guide gives London and Surrey businesses a practical order of work, so the new office is ready to operate rather than simply filled with boxes.

The right timetable depends on the size of the workplace, the condition of the new premises and whether your team can work remotely during the move. A five-person studio may move in a weekend. A busy office with meeting rooms, servers, specialist equipment and client-facing operations needs more lead time. The principle is the same: make decisions early, confirm responsibilities in writing and leave contingency where disruption would be costly.

12 to 16 Weeks Before: Set the Scope and Budget

Start by appointing one internal move lead with authority to gather information and make day-to-day decisions. They do not need to carry every box or manage every supplier, but they should be the clear point of contact for staff, the landlord, building management and your removals team.

Confirm what is moving, what is being replaced and what should be disposed of, donated or put into storage. This is the point to question furniture that no longer fits the new layout, old filing cabinets full of expired paperwork and stock that has quietly taken over a cupboard. Moving unwanted items costs money twice: once in handling and again in valuable space at the new site.

Request a detailed removal survey rather than estimating from photographs alone. A proper survey identifies lifts, stairs, loading restrictions, parking requirements, oversized furniture, fragile items and the labour needed for dismantling and reassembly. If you need packing, secure storage, clearance or furniture installation, arrange these under the same plan instead of adding them in the final week.

Your budget should include more than transport. Allow for packing materials, IT disconnection and reconnection, cleaning, dilapidations, temporary storage, access permits, new signage and any out-of-hours building charges. In central London and busy parts of South West London, loading arrangements can shape both the cost and timing of the move.

8 to 12 Weeks Before: Design the New Workplace

Do not wait until move week to decide where people will sit. Finalise a scaled floor plan showing workstations, meeting tables, storage, printers, kitchen equipment and reception furniture. Number or name each room, then use the same references on labels and move paperwork. A chair marked simply “Office” creates delay. A chair marked “Floor 3, Sales, Desk 14” can be placed correctly on arrival.

Check the new premises for practical constraints. Measure doorways, corridors, stairwells and lifts before ordering or moving large desks, sofas, cabinets or boardroom furniture. Confirm floor loading where heavy equipment is involved. If a lift has limited capacity or is reserved for other tenants at certain times, book it early.

This is also the time to agree handover dates with both landlords and building managers. Ask about vehicle height limits, loading bay booking slots, lift protection, insurance requirements, contractor sign-in procedures and permitted working hours. A move can be well organised and still lose hours if the lorry cannot access the loading area.

For premium furniture, designer pieces or show-home-standard interiors, plan delivery and installation separately from general box moving where needed. White-glove handling gives greater control over protection, placement, assembly and removal of packaging. It is particularly useful where furniture must arrive clean, undamaged and ready for client use.

6 to 8 Weeks Before: Lock Down IT and Communications

IT is often the critical path in an office relocation. Speak to your IT provider early about internet installation, network testing, server migration, telephone systems, security alarms, access control and audiovisual equipment. A new office without working connectivity is not operational, regardless of how good it looks.

Create an equipment register for laptops, monitors, docking stations, printers, routers, screens and specialist devices. Back up essential data and agree who is responsible for shutting down, disconnecting, transporting and reconnecting each item. Sensitive equipment may need anti-static packing, labelled crates or a dedicated chain of custody.

Tell staff what they need to pack personally and what will be handled for them. A simple deadline prevents drawers, lockers and desk cables becoming a last-minute problem. Ask managers to identify any confidential documents, medicines, controlled items or equipment that cannot travel in standard crates.

At this stage, notify clients and suppliers of the new address where relevant. Update stationery, online business listings, insurance records, delivery instructions and any licences tied to the premises. If you receive regular deliveries, make sure suppliers know which date the new address becomes active.

3 to 5 Weeks Before: Pack with a System

A successful office move is not about packing faster. It is about making every item easy to identify, protect and place. Use a consistent label format with the destination floor, room, employee or department, contents and crate number. Keep a separate inventory for higher-value equipment and furniture.

Pack non-essential archives, seasonal items, spare furniture and surplus stock first. Daily-use equipment should remain in service as long as possible, but it still needs a planned cut-off date. If your business cannot accommodate a full closure, phase the move by department or use a weekend and retain a small team at the old site until systems are confirmed.

Arrange property clearance now, not after everyone has left. Clearance work may reveal electrical waste, old fixtures or bulky furniture that require appropriate handling. It is more efficient to remove unwanted items before the main move than to load, transport and unload them without purpose.

Storage can provide useful breathing room where lease dates overlap, renovation work is incomplete or the new office has less space. Containerised storage is suited to larger volumes held securely for a defined period, while single-item storage can help with surplus furniture or individual business assets. The trade-off is access: decide in advance whether you may need specific items quickly.

1 to 2 Weeks Before: Confirm the Move-Day Plan

Hold a short move briefing with department leads, IT, reception and building management. Confirm the removal crew’s arrival time, loading bay access, parking suspensions, lift bookings, site contacts and the order in which rooms will be loaded and unloaded. Share a contact list that works outside normal office hours.

Prepare a first-day box for each key area. Reception may need visitor badges, stationery and a phone list. The kitchen needs basic supplies. Facilities may need keys, cleaning products and spare labels. IT needs its own clearly marked kit containing essential leads, tools and network information. These small preparations prevent staff searching through crates on Monday morning.

Walk through both premises just before the move. Photograph meter readings and the condition of rooms where required. Check that all personal belongings have been removed, confidential waste has been dealt with and no cupboards, loft spaces or under-desk areas have been missed.

Move Day: Protect Access, People and Priorities

The move lead should be available from the first vehicle arrival until the final handover. Their job is to resolve practical questions quickly: which entrance to use, where crates go, whether a desk needs to be dismantled, or who can approve a change to the plan.

Keep pedestrian routes clear and use appropriate protection for floors, lifts, doors and communal areas. Professional movers should handle loading safely, but building rules and shared access still need active management. For larger moves, unload in the order that supports reopening: IT and reception first, then workstations, meeting rooms and non-essential storage.

Before the crew leaves, check every room against the inventory and inspect high-value furniture and equipment. Report concerns immediately while the team and paperwork are still on site. Do not assume a labelled crate has reached the right room just because it is inside the building.

The First Week: Make the New Office Work

Plan a short operational check on the first working day. Test internet access, phones, printers, alarms, heating, kitchen appliances, meeting-room screens and access passes. Ask department leads to report missing items or layout issues by a set time, then deal with them in one organised sweep.

Some adjustments are normal. A storage unit may block a walkway, a meeting table may need repositioning or a team may need more locker space than expected. Keep a small contingency fund and a responsive supplier plan for these changes. OWN Removals & Storage can support businesses that need removals, storage, clearance, careful furniture delivery and installation without coordinating several separate providers.

A workplace move is judged by the first normal working day, not by the moment the last crate is unloaded. Give each stage enough time, keep the plan visible and make access, IT and staff communication your priorities. That is how a new workplace starts earning its keep quickly.

 
 
 

Comments


contact us

Contact us for a free estimate.

Thanks for submitting!

Areas We Cover

We are based in Kingston upon Thames and cover all the surrounding areas. These are just a few of the areas we cover:

London

​

Kingston upon Thames

 

Surbiton

​

Surrey

​

Property Clearance

South west England
​
Nation wide
​

 

Teddington
​

Esher
 

Box Shop

  • white glove furniture delivery

  • designer furniture delivery

  • interior designer delivery service

  • luxury furniture delivery

  • furniture installation service

  • premium furniture delivery

  • furniture assembly and delivery

  • high end furniture logistics

  • boutique furniture delivery

  • show home installation service

  • Facebook Social Icon
  • Tumblr Social Icon
  • Google+ Social Icon

​© Copyright 2025 OWN Transport LTD

VAT Number GB226644603 

Proudly created with Wix.com

bottom of page